Short answer: Measure the area and finished new depth of every refresh zone. Count rut area once, order only the layer being added, and investigate recurring water or soft ground before a surface-only repair.
Swipe the diagram sideways to see every label. The full calculation is written below it.
Inspect before adding gravel
Walk the driveway after rain. Mark soft spots, recurring ruts, standing water, exposed fabric, and places where the old surface is simply thin. A top-up quantity answers how much aggregate fills the planned surface; it does not diagnose drainage or failed ground beneath it.
Map depth zones without double counting
Measure the normal surface area and each rut or low area separately. If the rut area lies inside the full driveway area, calculate the ordinary layer across the entire driveway plus only the extra rut depth, or split into disjoint normal and rut zones. The adjustable example uses the latter so every square foot appears once. Finished cubic yards for each zone equal area × depth in inches ÷ 324.
Convert the order after the site decision
Keep finished volume separate from loose delivery, compaction, handling loss, density, and the supplier sales increment. If the existing base is sound, enter 0 for a new lower layer in the driveway planner and give the rut zone its own depth. If water or instability remains, seek a repair plan before buying a surface-only load.
Hypothetical worked example
Worked refresh: a 600 sq ft driveway contains a 100 sq ft worn section. If 500 sq ft gets 2 inches and the 100 sq ft section gets 4 inches total, finished volume is (500 × 2 + 100 × 4) ÷ 324 = 4.32 cu yd. This counts every square foot once. Set the new base layer to zero only after confirming the existing structure is sound; apply any loose-order factor separately.
Which situation matches your project?
Limit to check: A geometric fill quantity is not a repair design. The supplier must confirm product, loose delivery factor, density, and sales increment.
Measuring at the site? The guided field workflow records outlines and cutouts, checks their placement, and makes a printable sheet before you choose materials.
Further reading
YardSetup prepared this guide from the stated geometry and the linked references where provided. The adjustable example runs in your browser. See our formulas and limits or report an error.