What does this project take?
Sketch each straight run, gate, and corner before counting materials. Post spacing is applied to the solid spans on either side of gates; pickets or panels, rails, concrete, and gate hardware need separate decisions.
What to have before you calculate
- A run-by-run sketch with gate width and position
- Maximum span, fence height, panel or picket size, and rail choice
- Chosen hole and post dimensions plus the concrete bag’s printed yield
Choose the next step for your question
Before you place the order
Confirm the boundary, permit and height rules, gate hardware, post and hole design, and which panel lengths can be cut. Contact your state 811 center before digging and wait for the required utility responses.
Field guidance: 811: before you dig. YardSetup quantities remain planning estimates; confirm the product and site design locally.
Your route through the project
- Measure each run and mark every corner and gate.
- Choose spacing, picket dimensions, and rails per bay.
- Check the layout and local requirements before ordering.
1. Measure the actual work
Mark every straight run, corner, end, and gate on a site sketch. For each gate, measure its width and distance from the run start. A single total length cannot reveal the short spans on either side of a gate.
2. Choose the materials
Choose pickets and rails or premade panels, then enter the actual face dimensions and allowable spacing. Post count depends on spans and gate positions. Concrete is estimated from hole geometry and bag yield; hardware for the gate remains a separate supplier decision.
3. Prepare the order
Walk the proposed line to identify slope changes, obstructions, and access. Compare the diagram with the physical post marks before buying. Confirm panel cutability, post length, gate hardware, frost depth, and boundary or permit requirements locally.
What can change the estimate?
The tool does not determine the legal property line or structural adequacy of a fence. It is a material planning aid; a field layout can reveal changes that a distance-only calculation cannot.
Use the project planner
Place multiple gates on each run and estimate posts, rails or panels, pickets, post-hole concrete, fasteners, and cost. It shows the input assumptions and produces a shopping list you can review with a supplier.